Completion DateJun 2022
ClientsArmed Forces Engineering Authority
LocationFayoum
CategoryInfrastructure
The project aims to achieve agricultural development resulting from the latest technology
in the field of irrigation networks for an area of 13 thousand acres in the Al Lahun area with the intensive greenhouse system Green houses and relying on the irrigation source from the Nile (Al Lahun Canal)
The company’s role in implementing and taking the project’s water from the main canal, the project’s main lifting pump station, and the main expulsion line with a total length of 6 km (two lines, each 3 km) and the main water network works to the cluster tanks
The total value of the works in the contracts concluded with the company amounted to about 765 million pounds at 2021 prices, and all operations were completed